After the toilet, the next biggy was the shower!!! No more frigid trips through the frosty grass to shower in the trailer - never knew what a luxury a mere shower would turn out to be. Shower curtain or not, we were in! The backhoe made short work of the cement sidewalk coming from the parking lot. The old chimney from the wood stove was the last step in the living area before delivery of the new propane fireplace - no more cold mornings soon. Mike and his guys worked on the outside during the wonderful fall weather getting the dormers finished before the snow blows.
Wednesday, November 25, 2009
Friday, October 9, 2009
OMG - An Almost Kitchen - Oct. 9/09
Mike and John unloaded the first part of the kitchen!!! This is BIG. I was trying to not get my hopes up with respect to moving in, but this finished that. It seems like it might actually happen now. The last (hopefully) dumpster was delivered to clean up the construction mess. I think we can see the end ...
Monday, October 5, 2009
Friday, September 11, 2009
A Glimpse of What's to Come - Sep. 11/09
Wednesday, September 9, 2009
We're Getting There - Sep. 8/09
Here's the porch now - pretty well complete from the outside. They still need to add the plastic board at the bottom to finish it off plus the soffit and trim around the roof. The stairs will go off to the North side. They're working hard on the drywall -often look like ghosts when they come out for a break. I'd get a picture, but they might hit me. On Tuesday John's sister Karen and her oldest, Laurie, with her three little ones, came for a visit. The kids were all swimming (brave souls) and I imagine it was a quiet drive home.
Monday, August 31, 2009
Using the Porch - Aug. 30/09
The kids came up today and the weather wasn't good. Rather than crunch us into the trailer during the rain we decided to take chairs, the animals, and a little heater and spend the afternoon on the porch! If we weren't sure about the new windows, etc. before, we sure are now. We love it!!! With the windows and insulation, it's so quiet we'll have to crack a window to hear the wind in the trees and the waves. Our seasons will certainly be extended.
Monday, August 24, 2009
Look at it now - Aug. 24/09
The porch is going up by leaps and bounds! The roof was put on Friday and today they got the windows and door cut out and installed. They added the Typar and now we're just waiting for the inspection - hopefully tomorrow. It looks totally different from the old porch - it's going to take some "getting used to". I don't imagine it'll take long once we have a few chilly days this fall when we can still use it.
Hydro hookup/Wallboard delivery - Aug. 24/09
We are LIVE again. Can't believe it. There's even one plug inside that we can use already! Seems like we're just getting closer and closer. The wallboard for the downstairs was delivered this afternoon and they've gotten part of the downstairs done already. We'll be painting before we know it - oh, joy!
Thursday, August 20, 2009
Monday, August 17, 2009
Thursday, August 13, 2009
Busy Day - August 12/09
Big doin's today. Mike and his crew got the framing in place for the sonotubes for the new porch (is it really going to happen?). The cement truck arrived in the early afternoon, just after Marilyn, Dave, Caleb and Claire popped in from camping at Murphy's Point for a visit, a fish and a swim. While the cement truck was still there, a huge truck also arrived to deliver the lumber for the porch. They'll let the cement cure until early next week, and then get started on the porch. They also got started on the drywall upstairs today. We'll be wielding our paintbrushes before you know it!
Wednesday, August 12, 2009
New Siding - August 7, 10 & 11/09
Mike brought the siding in the back of his pickup and they were off to the races. They gradually covered the designer pink with our chosen "clay". They also got the back door installed after they finished the framing for the back deck. In the picture of the Hamilton's side you can see the hole for the new window we're having put in the corner on the lake side. That will make a huge difference with the breeze from the Ferry.
Thursday, August 6, 2009
"Booming" the Wallboard - July 31/09
A huge truck arrived with the wallboard for the upstairs. Mike had cut down the dorm window to allow them to "boom" it in, rather than hefting it all upstairs. When it was delivered, they patched the "door" into the dorm, added the sheeting, insulation, and finally the windows, completing the back wall. We now have designer pink on three walls.
Wednesday, August 5, 2009
Walls changed to designer pink - July 30/09
The guys worked long days this week - they stripped off the old siding, put up new sheeting and turned our cottage into designer pink with the addition of the insulation. They have also installed our new windows in all the walls except the front, which will have to wait until the porch is done. The excitement is building - it's really starting to take shape - making us all the more impatient to put this behind us and get back in.
Subscribe to:
Posts (Atom)